RESEARCH AND DEVELOPMENT
Timrite, through historic entities has been involved with support-related mining research and development since the mid 1960’s. The comprehensive R&D facility at Westonaria, west of Johannesburg, was established in 1990 with the ongoing objective of solving the complex support problems of South African mines.
A wide range of products designed and developed by the Westonaria facility has resulted in major advances in mining support design and strata control.
The centre is staffed by a highly skilled, multi-disciplinary team capable of addressing the support challenges of both shallow and deep mines. In collaboration with operational staff and external rock engineering expertise the team has developed key competencies focused on commercial product and systems based R&D.
A comprehensive workshop, allows the manufacturing of new support prototypes for extensive surface testing at our R&D facility where computerised equipment simulates the conditions underground.
Over 120 patents and trademarks have been registered by Timrite for the mining industry, which is testimony to the success of the collaboration between Timrite and it customers and the number of issues resolved.
All testing equipment is annually calibrated by a SANAS (South African National Accreditation)
TECHNICAL SERVICES
- Performance specifications for all products
- Risk Assessments on all products
- Product training and demonstrations
- Installation videos and posters
- Technical papers
- Product brochures
- The testing of 3rd party products.
CONFERENCE FACILITIES
- Conference room for up to 30 delegates
- Modern presentation equipment available
- Internal and external display areas
- Entertainment/catering amenities available
- Secure environment with ample parking
Dynamic Testing Apparatus
| Test weight: | 16t gravity mass block |
| Dynamic capacity: | 1 – 6 m/sec |
| Energy capacity: | 302 kJ |
| Test height: | 1.2m |
| Platen dimensions: | 110 x 110 cm |
| Data available: | Sampling rate 1000 /second Accelerometer for velocity Potentiometer for displacement |
| Products tested: | Elongates, Hydraulic Props & Packs |
10 000 kN Quasi Static Hydraulic Press
| Daylight: | 1,7m |
| Platen dimension: | 1,6m x 1,2m |
| Load Capacity: | 10 000 kN |
| Stroke: | 1,7 m |
| Displacement Rate: | 1 mm/day – 60mm/minute |
| Calibration: | Annually by accredited SANAS laboratory |
| Presentation: | Graphical Load & Displacement data captured |
| Products tested: | Elongates, Hydraulic Props & Packs |
1500KN ELONGATE PRESS
| Daylight: | 13 m |
| Platen dimension: | 0.5 x 0.5 m |
| Load Capacity: | 1500 kN |
| Displacement rate | 1 – 100 |
| Presentation | Graphical load and displacement data capture |
| Products tested | Packs, Elongates and Hydraulic Props |
400 kN Hydraulic Press
| Daylight: | 300mm |
| Platen dimension: | 30x30cm |
| Load Capacity: | 400 kN |
| Stroke: | 30cm |
| Travel Rate: | 0-30 c,/min |
| Calibration: | Annually by accredited SANAS Laboratory |
| Presentation: | Graphical Load & Displacement data captured |
FIRE RETARDENT TREATMENT
All Timrite’s timber products are available in a fire retardant treated form. Timrite applies the Pacsayf® chemical in a dipping process to allow for predetermined absorption levels. Treated products can offer the benefit of lower operational insurance cover for our customers.
MINEYARD MANAGEMENT
This on-site service offers the customer:
Trained staff and handling equipment to off-load and load products;
Stock Management (rotation to reduce wastage, minimum stock levels, quality control and administration).
